Development Project

In the western part of the complex the construction of another hall covering an area of 11,250 m2
(75 m x 150 m) and having a max height of 7.3 m is being prepared on free land. At present the project may be adjusted to the tenant’s wishes. The project being prepared has a sufficient internal flexibility and it will enable the building-in of an office floor. The minimum area of storage space when the building is divided will be 1,400 m2. After structural modifications and the completion of the whole project the overall storage area of the complex will be ca 22,000 m2. For the subject project the Planning Permit has been issued.



LOGISTIC PARK – D8 – LAYOUT SITUATION

1  Main entrance
2  Gatehouse
3  Car parking area
4  Office building
5  Handling area

6   Existing storage hall
7   New storage hall
8   Existing hall
9   New small storage hall
10 Truck waiting area



Structure:

Steel

Span of the structure:

18 m

Loading platforms:

23 platforms available

Storage height:

7.3 m

Floors:

Concrete

Heating:

From a central gas-fired boiler room

Lighting:

Fluorescent tubes

Telephone:

Available, ISDN, ADSL

Total area of roads proposed

12,000 m2

Parking area

950 m2

Handling area:

6,000 m2


Oficiální webová prezentace Logistic Park Líbeznice. ©2005