Development Project
In the western part of the complex the construction of another hall covering an area of 11,250 m2
(75 m x 150 m) and having a max height of 7.3 m is being prepared on free land. At present the project may be adjusted to the tenant’s wishes. The project being prepared has a sufficient internal flexibility and it will enable the building-in of an office floor. The minimum area of storage space when the building is divided will be 1,400 m2. After structural modifications and the completion of the whole project the overall storage area of the complex will be ca 22,000 m2. For the subject project the Planning Permit has been issued.
LOGISTIC PARK – D8 – LAYOUT SITUATION
1 Main entrance
2 Gatehouse
3 Car parking area
4 Office building
5 Handling area |
6 Existing storage hall
7 New storage hall
8 Existing hall
9 New small storage hall
10 Truck waiting area |
Structure: |
Steel |
Span of the structure: |
18 m |
Loading platforms: |
23 platforms available |
Storage height: |
7.3 m |
Floors: |
Concrete |
Heating: |
From a central gas-fired boiler room |
Lighting: |
Fluorescent tubes |
Telephone: |
Available, ISDN, ADSL |
Total area of roads proposed |
12,000 m2 |
Parking area |
950 m2 |
Handling area: |
6,000 m2 |
Oficiální